
Annual declarations
Support needed for the proper fulfillment of bureaucratic procedures.
Support needed for the proper fulfillment of bureaucratic procedures.
Support needed for the correct fulfillment of bureaucratic procedures
The final design phase involves the creation of the detailed executive project, including an analysis of the proposed individual solutions and the cost estimate for each item
We develop a concept and work by combining our know-how with measurements, in a joint process leading to the drafting of a feasibility study.The pre-project phase includes an analysis of the site hosting
Periodic maintenance of renewable and non-renewable energy systems
During the construction phase of the project, TESI Project can either take full responsibility for the Works Management or provide external consultancy.
Technical support during the authorization process and the connection solution to the grid
ENEA procedures